Overview
This job requires submittals marks the job as needing formal shop-drawing / package approval. When checked, pipeline and the job header show submittal status until packages are approved (or the requirement no longer applies).
Where in the app: New Job / Convert to Job → option card This job requires submittals
Open: Add Job · Jobs
Day-to-day package workflow (create, submit, revise) is covered in Job submittals.
What the checkbox does at create time
| Checked | Unchecked |
|---|---|
| Job is flagged as needing submittals | No submittal requirement banner / pipeline focus for this job |
| Pipeline and job header can show open submittal status | Submittals tab still exists if you add packages later |
| Defaults on for typical GC / commercial patterns (and when you enable external approvals) | Leave off for most residential installs |
You still create packages on the job Submittals tab after the job exists. The checkbox is the job-level “this job needs that workflow,” not the package itself.
Separate from Soft / Hard fab gating
Submittal requirement (this option) is not the same as production Soft/Hard gates:
| Concept | Role |
|---|---|
| Requires submittals (create job) | Visibility and expectation that packages must get approved |
| Package gates (purchasing / fabrication on a submittal) | Optional hold on POs or fab release for that package |
| Soft / Hard (Production settings) | How strongly open gates warn or block buyout and fab |
You can require submittals for status tracking without hard-blocking the shop, or combine both for strict commercial jobs. See Job submittals and Production settings.
When to check it
- GC or owner must approve shop drawings before buyout or fab
- Specs call for formal submittal packages
- You turned on Contract and approvals outside Dirt Face (Dirt Face often turns submittals on with that path)
Leave it off for typical residential installs where drawings are internal only.