Dirt Face Logo

Contract and approvals outside Dirt Face

Create a job when a General Contractor signs the contract and change orders in their own system, then record the signed subcontract later.

By Roc Demar, founder of Dirt Face and a fence contractor for 15 years · 6 min read

Open in app →

Overview

Contract and approvals outside Dirt Face (General Contractor / commercial) is for jobs where the General Contractor (or owner) creates and signs the subcontract and change orders in their system, not through Dirt Face customer portal signing.

You can still create the job immediately from the awarded bid, then attach the signed GC contract when it arrives.

Where in the app: New Job / Convert to Job → option card Contract and approvals outside Dirt Face
Open: Add Job · Jobs


Portal vs external

ModeUse when
Portal (default, checkbox off)Customer / GC reviews and signs through Dirt Face
External (checkbox on)GC paper or GC portal is the legal signature path; Dirt Face tracks the job and scope

External mode does not replace your awarded bid as the working scope in Dirt Face. It records that the binding GC document lives outside the app until you link it.


What happens when you enable it

  • Checking the box often turns on This job requires submittals (commercial drawing review is common on the same jobs)
  • Optional fields appear so you can paste details now or leave them blank:
    • Signed GC contract PDF URL
    • External contract #
    • Notes
    • “Signed subcontract differs from awarded bid” (plan to adjust job scope after create)

You can create the job with none of those fields filled and record the signed contract later from the job sidebar.


Typical workflow

  1. Win / award the bid in Dirt Face.
  2. Create the job with Contract and approvals outside Dirt Face on.
  3. Run submittals, materials, production, and schedule as usual.
  4. When the GC returns a signed subcontract, open the job sidebar and record PDF URL, external number, and notes.
  5. If the signed subcontract differs from the awarded bid, adjust job scope / pricing after create so field and billing match the GC document.

Tip: Use external mode for GC commercial work even if you do not have the PDF yet. Waiting to create the job until paper arrives delays scheduling, inventory, and fab.