Dirt Face Logo

Job requires scheduling

When to leave scheduling on for install work, and when to turn it off for supply-only, subcontractor, or office-only jobs.

By Roc Demar, founder of Dirt Face and a fence contractor for 15 years · 4 min read

Open in app →

Overview

This job requires scheduling controls whether the job is treated as work your crew should place on the calendar. Leave it on for install and field visits. Turn it off when the job should not appear in scheduling queues.

Where in the app: New Job / Convert to Job → option card This job requires scheduling
Open: Add Job · Schedule


What it does

SettingEffect
On (default)Job can enter unscheduled / scheduling flows and work-order planning
OffJob is kept out of the “needs schedule” path; useful when there is nothing for your calendar

Scheduling off does not delete the job or remove materials, billing, or production. It only signals that this record is not waiting for a crew slot.


Leave scheduling on when

  • You will install, dig, repair, or visit the site with your crew
  • You need calendar blocks, work orders, or dispatch visibility
  • The job is supply-and-install or a mix that includes field time

Turn scheduling off when

  • Supply-only fulfillment (ship / pick-up materials; no install)
  • Work is fully handled by a subcontractor and you do not schedule it in Dirt Face
  • Warranty paperwork, billing cleanup, or other office-only jobs with no site visit
  • You created a job mainly for costing or sales order tracking

Tip: If you are unsure, leave scheduling on. You can still delay placing the job on the calendar; turning it off is for jobs that should never compete for schedule attention.


After the job is created

Schedule from the job or from Schedule. See Work orders and scheduling and Schedule jobs.