Overview
Railings adds stair, ramp, and walk rails to an estimate's material list alongside the fence. You set up a railing style once with its tube, fittings, and charges, then enter each stair's or ramp's numbers to get the angle, steel, weight, and cost. Use it when a job includes stair or ramp rails made in your shop.
What this does
Where in the app: Estimates → open an estimate → Materials, then the Railings card
A stair rail is different on every stair: the rise and the tread set the angle, and the angle sets every cut. A ramp rail follows the ramp's slope between two landings. Railings lets you bid a rail quickly from the stair's or the ramp's numbers and puts its steel, fittings and charges on the estimate's material list with the fence.
Railings is being released to accounts in stages. If you do not see a Railings card on the Materials step of an estimate, it is not on for your account yet.
This release covers a flight of stairs, a ramp between two landings, and a walk: one rail over several parts in a row, such as a step and the sloped walk below it. Deck and balcony railings, and picket railings bought in sections, are set up and drawn like an ornamental fence: see Create a railing template with a guided build.
Before your first rail: make a railing style
A railing is a fabricated item, like a gate: one catalog item for the finished rail, with the tube, fittings and shop charges that go into it. A style says which catalog item that is, what a rail is made of and how you price it. You make it once and use it on every estimate.
First add the finished rail to your catalog, for example "Stair railing, pipe", sold each and marked as made in your shop. Add its steel, fittings and charges (core drilling, powder coating, installation) to the catalog too, each priced the way you buy or charge it: each, by the foot, by the pound, by the hour.
- Open an estimate and go to the Materials step.
- On the Railings card, select Railing styles.
- Under Start a new style from, pick the one closest to how you build:
- Square tube, mitered, loop at each end
- Pipe with elbows, mid and bottom rail
- Give the style a name your estimators will recognise.
- Under Sold and made as, select Choose item and pick the catalog item for the finished rail. Without it a rail is still priced, but it stays off the material list and production. If the item you pick is not marked as made in your shop, the style says so: its rails go on the material list, but production will not pick them up until you mark the item in the catalog.
- Check the settings. Every size can be changed:
| Group | What you set |
|---|---|
| Tube or pipe | Square tube or pipe, rail size, post size, wall, stock length, the longest piece before a splice, how far a splice is from a post |
| Rails and corners | Rail height, number of mid rails, bottom rail, mitered corners, bought elbows or bent corners, elbow size, bend radius, cope |
| Ends and posts | How the top and bottom end (level then a loop, a loop on the slope, or ending at the post), post distance from the nosing, most between posts, core drilled or base plate |
The small drawing beside the name changes as you change a setting.
Parts and charges
Each row of a style is one catalog part or charge that goes into the rail, and how it is counted on a rail. Together they are the rail's parts list and its cost. Add the rows that match how you price.
| Counted by | Use it for |
|---|---|
| Tube or pipe, from the cut list | Steel. A part sold by the foot is counted in feet. A part sold each is counted in whole sticks of the style's stock length. |
| Each piece | Elbows, base plates, splice locks. Choose which piece under Of. |
| Each post | Core drilled holes, anchors, grout |
| Each cut piece | Shop time by the cut |
| Each foot | Powder coating or labor by the foot |
| Each pound of steel | Hot dip galvanizing by weight |
| Each rail | Installation or a flat charge for each rail |
- For each multiplies the count. Two anchors a post: count by Each post, For each 2. Three hours a rail: count by Each rail, For each 3, with a part priced by the hour.
- Waste % adds to the count.
- Select Choose part to pick the part or charge from your catalog. Its unit and cost come from the catalog.
A row with no part is still counted, but it adds no cost. The rail shows which rows are not priced yet.
Select Save style.
Add a rail to an estimate
- On the Materials step, select Add rail on the Railings card.
- Enter a Name (for example "Unit 1") and the Qty if several stairs are the same.
- Under Rail for a, choose Stair, Ramp or Walk (several parts).
- Choose the Railing style. The same style serves stairs and ramps.
- For a stair, enter the stair:
- Risers: how many steps up
- Rise (in): the height of one step
- Tread (in): the depth of one step
- For a ramp, enter the ramp:
- Length of the ramp (in): along the slope, from landing to landing
- Rise per foot (in): 1 for a 1 in 12 ramp
- Choose which way the stair or ramp goes up, so the drawing matches the plan.
The angle, the rise per foot and the length along the nosings show as you type. A moment later the rail shows its posts, feet of steel, weight and cost, and the small drawing shows the rail on its stair.
When you have field measurements
Select Enter measured values instead to give what you measured:
| Field | When to use it |
|---|---|
| Last riser (in) | The bottom step down to the walk is a different height from the others |
| Total rise (in) | You measured the whole flight top to bottom |
| Total run (in) | You measured from the first nosing to the last |
| Measured angle (deg) | You measured the angle of the stair; it replaces the one worked out from rise and tread |
Set Measured from to Field measure so the rail records where its numbers came from.
Ramps
A ramp rail is level over each landing with a loop back to its end post, and its end posts stand on the landings. An end that has no loop in the style has none on a ramp either.
For a ramp, Enter measured values instead offers Total rise (in) (landing to landing) and Measured angle (deg). Either one takes the place of the rise per foot.
Walks: several parts in one rail
Choose Walk (several parts) when one rail runs over more than one thing: a step and the sloped walk below it, a flight, a landing and a ramp, or just a sloped walk with no landings of its own. List the parts from the top down. Select Add part for each one, and choose its kind:
| Part | What you enter |
|---|---|
| Step or stair | Risers, rise and tread, or its pitch in degrees. A single step still needs a tread or a pitch: that is the angle the rail takes over it. |
| Sloped walk | Its length along the walk, and its rise per foot or measured angle |
| Level run | Its length |
The top of the rail stays the style's rail height above the surface the whole way. Down a step or stair it runs at the stair's pitch until it is that height above the part below. Wherever the slope changes the rail is mitered, half the change on each piece. There is a loop at each end.
- Top post from the start (in) and Bottom post before the end (in) set where the end posts stand on a walk. Use the bottom one to stop a rail short and leave room for the next rail. When the walk starts or ends with a step or stair, that end's post follows the step instead.
- The numbers under the parts show the steepest part, the rail's length end to end and the total rise.
Mid rails and a bottom rail follow the top rail between the posts: mitered wherever the slope changes, and cut to each post. A walk is laid out with mitered corners and without splices for now. A style with elbows or bends is still priced, with mitered corners, and the rail says so.
Long rails and splices
A rail longer than the style's Longest piece (the stock length when left blank) is cut into lengths at a splice, a set distance down the slope from a post. Every rail of the railing is cut at the same place, and each cut counts one splice lock. Add a row counted by Each piece of Splice locks to price them.
Show a rail on the fence drawing
When the estimate has a fence drawing, you can mark where a rail runs on it and take the rail's length from the drawing.
- Open the estimate's drawing.
- Open Elements and, under the lines, select Railing.
- Click where the rail starts, then click where it ends. A dashed amber line is drawn.
- Select the line. The bar above the drawing shows its length at the drawing's scale.
- In Rail, choose the rail of the estimate this line is for, or choose New rail from this line.
- To give the rail the drawn length, select Use … as its run.
- Continue to the estimate. The rail is on the Railings list of the Materials step, where you enter its risers, rise and tread, and where it is priced.
What to know:
- The line is seen from above, so its length is the rail's level run. A stair takes it as its total run. A ramp turns it into its length along the slope, at the ramp's slope. A walk is entered part by part on the estimate, so a line can be tied to a walk but does not change it.
- A railing line is never counted as fence. It adds no posts, no footage and no fence material.
- The length needs the drawing's scale. On a drawing with no scale yet, the bar says Set the drawing's scale to measure.
- Rails made or changed this way are saved when you continue from the drawing. Moving or stretching the line later does not change the rail until you select Use … as its run again.
- The line shows on the picture of the drawing the customer and the crew see.
Where the cost goes
Each rail is added to the material list below the card as its style's catalog item: one row for each item, the quantity being the number of rails, the cost what those rails come to for each one. The tube, fittings and charges are not rows of their own; they are what the rail is made of, as with a gate built in your shop. The rows are included in the materials total.
You can change the cost on one of those rows as on any other row; it stays when you change a rail. Changing the fence drawing does not remove the railing rows.
A rail whose style has no catalog item yet says so under its numbers and is not on the material list.
In production
When the estimate becomes a job, the railing item is picked up for production like any other item made in your shop: a draft production order for the item, for the number of rails.
The order's parts are the tube, fittings and charges of all its rails together. Its cut list has every piece of every rail, named for its rail, with the cut at each end. A rail that has a shop drawing is cut as it stands on the drawing, and the drawing goes with the order; a rail with no drawing is cut as it was bid, and its cuts say "as bid, not measured".
Draw a rail when the job is won
Each rail has a Shop drawing button (the pencil and ruler). It opens that rail's drawing in the shop drawing tool, filled in from the rail: the first time it makes the drawing, after that it opens the same one. The drawing is listed with the estimate's other shop drawings.
On the drawing, select the railing to change it. Enter what you measured on the job (the angle, the last riser, the total rise and run, the ground at a post) and change any size of the rail. The drawing shows the rail height, each post's length, the post centres and the slope, and its cut list gives every length with the cut at each end.
This works on a sent estimate too: the rails on the estimate stay as they were bid, and what is measured goes on the drawing.
Print the drawings as one set
When at least one rail has a drawing, Drawing set appears at the top of the Railings card, with the number of drawings. It downloads one PDF with a sheet for each drawn rail, in the order of the rails. Each sheet has the drawing, the rail's cut list (every length with the cut at each end, and "coped" where a pipe is coped), the angle, the weight of steel, and how many to make.
The set is made from the drawings as they stand, so a change made in the shop drawing tool is on its sheet. A drawing shows on its sheet once it has been opened and saved in the shop drawing tool.
Bid versus measured
Once a rail has a drawing, the rail on the estimate shows a line under its numbers:
- Shop drawing: as bid. The drawing still matches what was priced.
- Shop drawing, as measured: followed by what changed, for example the angle, the feet of steel and the cost, each with its difference from the bid. The measured cost uses the rail's style at today's catalog costs.
The estimate's price does not change by itself. Use the difference to decide whether to issue a change.
After the estimate is sent
Once an estimate has been sent, its rails can no longer be changed, like the rest of the estimate. The rails and the result each was priced from are kept with the copy of the estimate the customer was sent.
Common questions
The rail says "Choose a railing style for this rail". The style was not chosen, or it was made by a different account. Choose a style from the list.
A warning says a loop is too tight or too short for its corners. The loop set in the style does not leave room for the elbows or bends. Open the style and increase Loop clear of the post or Loop height, or reduce the elbow size or bend radius.
The steel quantity is in sticks, not feet. The part chosen for the steel row is sold each. All the pieces of the rail (and of every copy of it, when the quantity is more than one) are fitted into sticks of the style's Stock length.
I turned a style off. Rails that already use it keep it. It is no longer offered for new rails. Open Railing styles and select Turn on to bring it back.