Vendor units and package prices

Type what you pay for a roll, box, bundle or stick and Dirt Face works out the cost per foot or per piece. Includes worked package price examples.

By Roc Demar, founder of Dirt Face and a fence contractor for 15 years · 6 min read

Open in app →

Overview

Vendors sell fabric by the roll, bolts by the box and ties by the bundle. You count those parts by the foot or by the piece. With a vendor unit you type the price the way it is on the vendor's price list, and Dirt Face works out the cost per foot or per piece for you.

Every part still has one unit of measure, and its cost is always the cost of one of that unit. Estimates, purchase orders, inventory and reports all use that cost. The package price is kept beside it so you can see how the cost was worked out.

Where in the app: the Vendor prices step after you create a fence template with a guided build or add components from attributes, and Sidebar → Fence → My Components → open a component → Vendors / Costs
Open: My Components

These fields are being released to accounts in stages. If you do not see them, your account does not have them yet, and you type the cost per unit as before.


The Vendor prices step

The step opens after you create a fence template with a guided build, and after you add components from attributes. You can also open it later from the template's Still to do on this template panel with Add vendor prices.

  1. Choose the Vendor.
  2. For each part, fill in:
FieldWhat to type
Part numberThe vendor's part number. It is filled in when the directory knows it. See Vendor part numbers from the directory.
Sold byHow the vendor sells it: roll, box, bundle or stick.
How many ft in one rollHow many of the part's own unit are in one of those. The label uses the part's unit and what you chose under Sold by. Needed when you chose something under Sold by.
Price per rollWhat you pay for one.
  1. Check the line under the fields, for example Cost per ft: $2.00. That is the cost Dirt Face will use.
  2. Click Save prices.

Parts with no price and no part number are not changed. A part number, typed by you or filled in from the directory, is saved by itself when there is no price yet; the part's cost is then left alone and you can add the price later. Click Skip for now to add prices later, or Done after you have saved.

Under the parts is a tick box, Use these prices as the cost of these parts in estimates:

  • Ticked (the usual choice): the vendor you chose becomes the main vendor of the parts you save, so their cost is this vendor's cost.
  • Unticked: the prices are kept on file only and estimates keep using each part's main vendor. A part with no main vendor yet still gets this one.

A price must be more than zero. When you chose something under Sold by and left the count empty, the screen says "Type how many ft are in one roll." and nothing is saved until you fill it in, so a roll price is never used as the cost of one foot.

If a number cannot be used, the part is not saved and the screen tells you why, for example "Enter how many ft are in one roll. It must be more than zero." The other parts are saved.


Worked examples

A 50 ft roll at $100

The part is counted by the foot.

FieldValue
Sold byroll
How many ft in one roll50
Price per roll$100.00
Cost per ft$2.00

A 200 ft fence uses 200 ft at $2.00, which is $400.00.

A box of 100 at $12.50

The part is counted by each.

FieldValue
Sold bybox
How many ea in one box100
Price per box$12.50
Cost per ea$0.125

Costs are kept to four decimals, so small parts keep their true cost. A box of 1,000 ties at $7.99 is $0.008 each, and the $7.99 is kept beside it.

Pipe priced $1.50 per foot, on a 21 ft stick

The part is counted by each: one stick. The vendor's price list shows a price per foot, so work out the price of a stick first: 21 × $1.50 = $31.50.

FieldValue
Sold bystick
How many ea in one stick1
Price per stick$31.50
Cost per ea$31.50

A roll priced per foot, with a full quantity of 50

Some vendors print a price per foot and sell only full 50 ft rolls. The price is already per foot, so there is nothing to divide.

On the component's Vendors / Costs tab:

FieldValue
Cost$2.00
Qty / PKG50

Qty / PKG is the full quantity: how many come in one package. It is information for ordering. It never divides the cost. A part with a cost of $2.00 and a Qty / PKG of 50 costs $2.00 per foot.


On the component form

Open a component and go to Vendors / Costs. Each vendor has Sold by, How many ... in one ... and Price per .... When they are filled in, the cost is worked out and shown, not typed. Clear the price to type a cost per unit again.

A part has one line per vendor. If a vendor sells the same part in two package sizes, keep the one you buy.


Receiving at a different cost

Purchase orders and receiving work as before. You order and receive in the part's own unit, and the cost on the receive screen is the cost of one of that unit. The cost box is labelled with the unit, for example Cost per ft.

When you receive at a cost that differs from the part's cost, the vendor's cost on the part changes, as it always has. The package price follows it.

Example: fabric is $100.00 per 50 ft roll, $2.00 per ft. You receive 150 ft at $2.20 per ft. The vendor's cost becomes $2.20 per ft and the package price becomes $110.00 per roll. The same happens when you enter a vendor invoice with a different cost.

How stock is valued and how freight and other landed costs are spread are not changed.

What the warning on the receive screen means

When you save a receipt or a vendor invoice, Dirt Face checks each cost you typed. It asks you to confirm when a cost:

  • looks like the package price. For example: "Fabric: you typed $100.00 per ft. This vendor's price is $100.00 per roll of 50 ft, which is $2.00 per ft." Typing the roll price as the cost per foot would value 150 ft at $15,000 instead of $300.
  • is far above the order's cost. For example a cost several times what the purchase order says.

Click Go back and fix to change the cost. Click Yes, save these costs if the cost is right. Nothing is blocked: the warning only asks.


Price changes from other tools

  • Cost Update Wizard: for a part with a package price, the percentage is applied to the package price, rounded to cents, and the cost per unit is worked out from it. A 10% increase on a $100.00 roll of 50 ft gives $110.00 per roll and $2.20 per ft. See Cost Update Wizard.
  • Import Vendor Costs (CSV): the price column is the cost per the part's own unit, as before. The import keeps the vendor unit, and the package price follows the new cost. See Import Vendor Costs.

Package prices from a vendor price list

When you upload a vendor's price list in Smart Import, a price for a roll, coil, bag, box, set or pound is handled the same way as on the Vendor prices step. If the row says how many are in one, for example a 500 ft coil, the cost per foot or per piece is worked out and the package price is kept beside it. If it does not, the part number is saved and the price waits until you type how many are in one, so a roll price is never used as the cost of one foot. A part that already has a package for that vendor keeps its Sold by and count, and the package price follows the new cost. See Import a vendor price list.


Parts a template made with a guided build uses

A template made with a guided build counts each part in its row's unit: sticks of pipe, pieces of bolts and hog rings, feet of wire and fabric. When the guided build uses a part you already have whose unit is different, the guided build says so before the template is made:

  • Pipe priced per foot (unit of measure ft) on a row that counts sticks: the row is counted in feet. 147 ft of fence charges 147 ft of a 21 ft stick, and the estimate rounds up to the foot, not to a whole stick.
  • A part priced per box, bag, roll or coil on a row that counts pieces or feet: the wizard asks how many are in one, and shows the change, for example "$23.72 per box of 100 becomes $0.2372 each". With your answer, the part is saved the way this page describes: Sold by box, How many ea in one box 100, Price per box $23.72, Cost per ea $0.2372, and its unit of measure becomes ea. It is never changed without your answer.
  • A part priced each is never changed, whatever its Qty / PKG says.

See Parts priced in a different unit.


What does not change

  • Estimates and templates. Quantities and costs are in the part's own unit, as before.
  • Purchase orders. Lines are in the part's own unit.
  • Store selling. How a part is sold in your store, including selling in full rolls or boxes, is set on the component as before. A vendor unit does not change it.
  • Parts without a vendor unit. They work exactly as they did.

Common questions

I typed the roll price as the cost and my estimate is far too high.
Open the component, go to Vendors / Costs, and fill in Sold by, How many ... in one ... and Price per ... for that vendor. The cost is worked out again.

Which cost do estimates use?
The cost per the part's own unit from the part's default vendor.

Can I leave "How many" empty?
Only when nothing is chosen under Sold by. Empty then counts as 1, so the price is the cost of one unit. With a roll, box, bundle or stick chosen, the count is needed and the part is not saved without it.

Can I have two vendors with different packages?
Yes. Each vendor has its own line, with its own package and price. The default vendor's cost is the part's cost.